Summary

  • Mechanical Engineer with over 23 years of experience in advanced inspection and integrity assessment in the energy, offshore, and industrial sectors.
  • Expert in advanced NDT technologies, process optimization, and quality assurance.
  • Proven record in leading inspection teams, developing AUT procedures and scan plans, designing calibration blocks, training personnel, and performing PAUT, TOFD, TFM, and AUT data analysis and audits.
  • Focused on innovation, reliability, and continuous improvement.
  • Fluent in Portuguese, proficient in English and Spanish.
  • Strong ability to manage or support work teams in diverse, multidisciplinary groups while maintaining positive relationships with peers, contractors, supervisors, and customers.

Years of Experience

23+

Residence

Aveiro, Portugal

Title

Advanced NDT Inspector - ISO-9712 Certified - UT / PAUT / TOFD

Graduation Year

2002

Graduation Year

2023

Title

Mechanical Engineer

Work Experience

TÜV Austria Iberia – CSwind PT

Advanced NDT Inspector

December 2024 - Now

Project: Onshore and Offshore Wind Towers Manufacturing

AUT Search Unit: Olympus Omniscan X3 / Omni_Pc software.

Technical Duties: UT / PAUT / TOFD inspections on carbon-steel butt welds, scan plan development, advanced data evaluation, and training of inspectors and scanner operators.

ISQ Portugal – Fusion for Energy

Third-Party PAUT Technical Auditor

January 2023 - Now

Project: ITER Project - Nuclear Vacum Vessel

AUT Search Unit: Olympus Omniscan / Tomoview and Omni_Pc software.

Technical Duties: Full review of PAUT system parameters and weld-inspection processes, ensuring proper execution from system calibration to data audits. Verification of all scan parameters, indications, and supplier reports, including cross-checks with Visual, Dimensional, and Radiographic Inspection data. (Base material: Stainless steel).

ISQ Brasil

Quality Control Supervisor

April 2022 - April 2025

Project: In-service maintenance Inspections

AUT Search Unit: Olympus Omniscan / Tomoview and Omni_Pc software – Eddify Gekko and Mantis / Capture Software.

Technical Duties: UT / PAUT / TOFD / FMC-TFM and corrosion mapping on pressure vessels. Phased Array inspections on nozzle and node welds. Qualification of procedures, scan plans, data analysis, and training of inspectors and scanner technicians.

Key Responsibilities:

  • End-to-end supervision of inspection activities, ensuring full compliance with project procedures and technical requirements.
  • Strategic planning, scope definition, and allocation of resources for each inspection scenario.
  • Coordination and interface with clients, engineering teams, auditors, and technical consultants.
  • Management of workflows, deadlines, deliverables, and team performance.
  • Monitoring of inspection results, quality metrics, and project progress until final completion.

Brito & Kerche

Quality Control Supervisor

August 2021 - April 2022

Project: In-service maintenance Inspections

AUT Search Unit: Olympus Omniscan / Tomoview and Omni_Pc software – Eddify Topaz / Ultravision Software.

Technical Duties: UT/PAUT/TOFD/TFM/Corrosion Mapping/HTHA inspections, including PAUT at nozzle and node welds. Qualification of PAUT/ToFD procedures, development of scan plans, AUT data analysis, and training of inspectors and scanner technicians.

Key Responsibilities

  • End-to-end supervision of inspection activities, ensuring full compliance with project procedures and technical requirements.
  • Strategic planning, scope definition, and allocation of resources for each inspection scenario.
  • Coordination and interface with clients, engineering teams, auditors, and technical consultants.
  • Management of workflows, deadlines, deliverables, and team performance.
  • Monitoring of inspection results, quality metrics, and project progress until final completion.

Imetame Metalmecânica S.A. – KLABIN S.A.

Advanced Ultrasonic Supervisor

September 2020 - July 2021

Project: PUMA II

AUT Search Unit: Olympus Omniscan X3 / Omni_Pc software

Technical Duties: UT/PAUT/TOFD/FMC-TFM inspections of P-91 steam pipe welds (Ø 2”×5 mm to 24”×56 mm), including scan plan development, data analysis, and training of inspectors and scanner technicians.

Development and validation, in partnership with Petrobras, of a PAUT procedure for CRA pipelines using DLA probes (Carbon Steel and Inconel 625).

Key Responsibilities

  • End-to-end supervision of inspection activities, ensuring full compliance with project procedures and technical requirements.
  • Coordination and interface with clients, engineering teams, auditors, and technical consultants.
  • Monitoring of inspection results, quality metrics, and project progress until final completion.

Araujo Engenharia

Advanced Ultrasonic Supervisor

August 2017 - August 2020

Project: In-service maintenance Inspections

Technical Duties: UT/PAUT/TOFD/TFM/Corrosion mapping/HTHA inspections. Phased Array inspection at Nozzle and Node welds, inspection welds of special alloys, such as: Stainless Steel, Duplex, Super-Duplex, Incolloy as well as Carbon Steel. Qualifications of procedures, scan plans, AUT data analysis, training of inspectors and scanners technicians.

Key Responsibilities

  • End-to-end supervision of inspection activities, ensuring full compliance with project procedures and technical requirements.
  • Strategic planning, scope definition, and allocation of resources for each inspection scenario.
  • Coordination and interface with clients, engineering teams, auditors, and technical consultants.
  • Management of workflows, deadlines, deliverables, and team performance.
  • Monitoring of inspection results, quality metrics, and project progress until final completion.

Phased Brasil LTDA – BrasFels Shipyard

Phased Array Specialist

April 2017 - July 2017

Project: Revamp MODEC MV-29

AUT Search Unit: Olympus Omniscan / Tomoview and Omni_Pc software

Technical Duties: Phased Array inspection of welds in special alloys — Stainless Steel, Duplex, and Super-Duplex — using the Water Wedge technique. Procedure qualification for stainless steel pipes with Ø1” diameter.

Enfil Degremont – Petrobras/REDUC

Advanced NDT Inspector

March 2016 - July 2016

Project: Construction of Storage Tanks

AUT Search Unit: TD-Handy Scan / TD-Scan Software

Technical Duties: PAUT/TOFD inspections of welds, carbon steel, scan plans, data analysis, training scanners technicians.

Estrutural S/A – Petrobras/RPBC

Advanced NDT Inspector

September 2015 - December 2015

Project: In-Service Inspection - ShutDown

AUT Search Unit: TD-Handy Scan / TD-Scan Software

Technical Duties: Monitoring of discontinuities for Risk-Based Inspection (RBI) analysis using TOFD, Phased Array, and Conventional UT techniques, applied to butt welds and nozzle welds in pressure vessels.

Niplan Engenharia – White Martins S.A.

Advanced NDT Inspector

August 2015 - November 2015

Project: White Martins Power Plant (CSP)

AUT Search Unit: TD-Handy Scan / TD-Scan Software

Technical Duties: Qualification Procedure of Sectorial Phased Array, Inspection welds of carbon steel and stailess steel.

DTST Technology – Construtora OAS – Petrobras

Operational Director

February 2013 - September 2015

Project: Emissary Submarine Pipeline (Petrobras/COMPERJ) - (API-1104/ASTM E:1961)

Key Responsibilities

  • End-to-end supervision of inspection activities, ensuring full compliance with project procedures and technical requirements.
  • Strategic planning, scope definition, and allocation of resources for each inspection scenario.
  • Coordination and interface with clients, engineering teams, auditors, and technical consultants.
  • Management of workflows, deadlines, deliverables, and team performance.
  • Monitoring of inspection results, quality metrics, and project progress until final completion.

DTST Technology – Usiminas Mecânica – Petrobras

Operational Director

June 2012 - December 2012

Project: Inspection of nozzles of H2 e H2S Pressure Vessels (Petrobras/REPLAN)

Key Responsibilities

  • End-to-end supervision of inspection activities, ensuring full compliance with project procedures and technical requirements.
  • Strategic planning, scope definition, and allocation of resources for each inspection scenario.
  • Coordination and interface with clients, engineering teams, auditors, and technical consultants.
  • Management of workflows, deadlines, deliverables, and team performance.
  • Monitoring of inspection results, quality metrics, and project progress until final completion.

DTST Technology – Alusa-MPE – Petrobras

Operational Director

January 2012 - December 2014

Project: Construction of Oil Storage Tanks (Petrobras/COMPERJ)

Key Responsibilities

  • End-to-end supervision of inspection activities, ensuring full compliance with project procedures and technical requirements.
  • Strategic planning, scope definition, and allocation of resources for each inspection scenario.
  • Coordination and interface with clients, engineering teams, auditors, and technical consultants.
  • Management of workflows, deadlines, deliverables, and team performance.
  • Monitoring of inspection results, quality metrics, and project progress until final completion.

Absolute NDE – SBM Off Shore

Phased Array Specialist

June 2011 - December 2011

Project: Inspection of Power Pipping welds (Talisman Energy)

AUT Search Unit: Olympus Omniscan / Tomoview software

Technical Duties: Calibrations Setups of Sectorial Phased Array/Water Wedge, data acquisition, and PAUT data analysis.

DTST Technology – GASVAP – Petrobras

Operational Director

March 2011 - June 2011

Project: Inspection of Power Pipping welds (Petrobras/REVAP)

AUT Search Unit: TD-Handy Scan / TD-Scan Software

Technical Duties: Control documentation traceability, qualification Procedure of Sectorial Phased Array for small diameters, data acquisition and PAUT data Analysis.

Key Responsibilities

  • End-to-end supervision of inspection activities, ensuring full compliance with project procedures and technical requirements.
  • Strategic planning, scope definition, and allocation of resources for each inspection scenario.
  • Coordination and interface with clients, engineering teams, auditors, and technical consultants.
  • Management of workflows, deadlines, deliverables, and team performance.
  • Monitoring of inspection results, quality metrics, and project progress until final completion.

UT Quality – Techint – Petrobras

Phased Array Specialist

November 2010 - March 2011

Project: Inspection of Power Pipping welds (Petrobras/REVAP)

AUT Search Unit: Olympus Omniscan / Tomoview software

Technical Duties: Control documentation traceability, data acquisition and PAUT data Analysis.

Consortium Caraguatatuba – Petrobras

UT Inspector

June 2009 - May 2010

Project: Inspection of Power Pipping Welds, Structural Pipe Rack, Water Pipeline (Petrobras/UTGCA)

UT Search Unit: Sonatest - Sitescan 240

ArcTest – Galvão-Contreras – Petrobras

AUT Inspector

February 2009 - June 2009

Project: GASDUC III Pipeline (Petrobras) - (API-1104/ASTM E:1961)

AUT Search Unit: SCI Systems (multi-probe)

Technical Duties: Control documentation traceability, qualification Procedure of zonal discrimination and ToFD techniques, training of scanners technicians, AUT data Analysis.

Setend – Subsea 7 – Shell S.A.

Operations Supervisor

July 2008 - February 2009

Project: Jumper Fabrication (Rizers / Flowlines, Umbilicals and Subsea Hardware Installation)

Key Responsibilities

  • End-to-end supervision of inspection activities, ensuring full compliance with project procedures and technical requirements.
  • Strategic planning, scope definition, and allocation of resources for each scenario.
  • Coordination and interface with clients, engineering teams, auditors, and technical consultants.
  • Management of workflows, deadlines, deliverables, and team performance.
  • Monitoring of inspection results, quality metrics, and project progress until final completion.

Setend Technical Services

UT Inspector

February 2002 - June 2008

Project: Pipeline maintenance, tie-ins

UT Equipaments: Sonatest - Sitescan 240

Assignments: Control documentation traceability, calibrations, inspections and reports.

Skills

  • Project Management

    Team Leadership

    Microsoft Office

    Clear and effective communication

    Teamwork and collaboration

    Critical thinking

    Adaptability

    Professional ethics

    Attention to detail

  • Industry Knowledge

    Engineering

    Advanced Non-Destructive Testing (NDT) methods

    Risk-Based Inspection (RBI)

    Codes and standards

    Quality assurance and documentation

    Safety and integrity management

    Welding Inspection

  • Interpessoal Skills

    Networking

    Conflict resolution

    Empathy

    Adaptability in social contexts

    Leadership support

Languages

Language

Portuguese

Fluent

Language

English

Proficient

Projects

Onshore / Offshore Wind Tower Manufacturing

Phased Array / ToFD Specialist

December 2024 - undefined

UT/PAUT/TOFD inspections on carbon steel full penetration butt welds with a wide range of thicknesses, scan plans, analysis of PAUT/ToFD data, training of inspectors and scanner technicians.

ITER Project - Nuclear Vacuum Vessel

Phased Array Third Part Auditor

January 2023 - undefined

Revision of all parameters of PAUT systems and weld inspection processes to ensure the correct execution of Phased Array inspection procedures, from calibration of PAUT systems until audits on scan data files and check all parameters as well as all indications and reports made by suppliers.

In-service maintenance Inspections

Advanced Ultrasonic Supervisor

April 2022 - January 2023

UT/PAUT/TOFD/TFM/Corrosion mapping inspections on pressure vessels. Phased Array inspection at Nozzle and Node welds.

In-service maintenance Inspections

Advanced Ultrasonic Supervisor

August 2021 - April 2022

UT/PAUT/TOFD/TFM/Corrosion mapping/HTHA inspections. Phased Array inspection at Nozzle and Node welds.

KLABIN S.A. – PUMA II

Advanced Ultrasonic Supervisor

September 2020 - July 2021

UT/PAUT/TOFD/TFM inspections of steam pipe welds, P-91 material, wide pipe range (Ø 2”x5mm to 24”x56mm), scan plans, data analysis, training inspectors and scanners technicians.

In-service maintenance Inspections

Advanced Ultrasonic Supervisor

August 2017 - August 2020

UT/PAUT/TOFD/TFM/Corrosion mapping/HTHA inspections. Phased Array inspection at Nozzle and Node welds, inspection welds of special alloys.

Revamp MODEC MV-29

Phased Array Specialist

April 2017 - July 2017

Phased Array inspection in welds of special alloys using Water Wedge technique.

Construction of Storage Tanks

Phased Array / ToFD Specialist

March 2016 - July 2016

PAUT/TOFD inspections of welds, carbon steel, scan plans, data analysis, training scanners technicians.

In-Service Inspection - ShutDown

Phased Array / ToFD Specialist

March 2016 - July 2016

Monitoring discontinuities for RBI analysis using TOFD, Phased Array and Conventional UT for Butt welds and Nozzle welds in pressure vessels.

White Martins Power Plant (CSP)

Phased Array Specialist

March 2016 - July 2016

Qualification Procedure of Sectorial Phased Array, Inspection welds of carbon steel and stainless steel.

Emissary Submarine Pipeline

Advanced Ultrasonic Supervisor

April 2013 - September 2015

Team management, communication interface between manufacturer, customer, and AUT team, control documentation traceability, qualification Procedure of zonal discrimination, Sectorial Phased Array and ToFD techniques, training of inspectors, AUT data Analysis and audits.

Inspection of nozzles of H2 and H2S Pressure Vessels

Advanced Ultrasonic Supervisor

June 2012 - December 2012

Team management, communication interface between manufacturer, customer, and AUT team, control documentation traceability, qualification Procedure of Sectorial Phased Array, training of inspectors, PAUT data Analysis and audits.

Construction of Oil Storage Tanks

Advanced Ultrasonic Supervisor

January 2012 - December 2014

Team management, communication interface between manufacturer, customer, and AUT team, control documentation traceability, qualification Procedure of Sectorial Phased Array and ToFD, training of inspectors, PAUT/ToFD data Analysis and audits.

Inspection of Power Piping welds

Phased Array Specialist

June 2011 - December 2011

Calibrations Setups of Sectorial Phased Array/Water Wedge, data acquisition, and PAUT data analysis.

Inspection of Power Piping welds

Phased Array Specialist

March 2011 - June 2011

Control documentation traceability, qualification Procedure of Sectorial Phased Array for small diameters, data acquisition and PAUT data Analysis.

Inspection of Power Piping welds

Phased Array Specialist

November 2010 - March 2011

Control documentation traceability, data acquisition and PAUT data Analysis.

Inspection of Power Piping Welds, Structural Pipe Rack, Water Pipeline

UT Inspector

June 2009 - May 2010

Control documentation traceability, training inspectors for AWS procedure, calibrations, and reports.

GASDUC III Pipeline

AUT Inspector

February 2009 - June 2009

Control documentation traceability, qualification Procedure of zonal discrimination and ToFD techniques, training of scanners technicians, AUT data Analysis.

Jumper Fabrication

Operations Supervisor

July 2008 - February 2009

Supervision and Qualification of Heat Treatment procedures Rizers.

Pipeline maintenance, tie-ins

UT Inspector

February 2002 - June 2008

Control documentation traceability, calibrations, inspections and reports.