Summary

Over 12 year of experience in the field of electrical engineering, providing leadership and guidance to the technical office department on matters related to review and approval contractor’s submittals and related work; coordination and issuance of the approved shop drawings submitted by the Contractors of electrical power distribution systems such as medium and low voltage, light current, power transformers, underground cables. General skills are the ability to work under stress, flexible and friendly in nature, team player, ambitious, hard worker, self- motivated and possess leadership skills, very good communication, interpersonal, documentation & presentation skills, flexibility to learn and handle any new software package.

Marital status

Married

Birth date

18 Nov 1985

Graduation Year

July 2008

Nationality

Egyptian

Residence

Qatar

Work Experience

ECG Engineering Consultants Group S.A.,

Senior Electrical Engineer

September 2017 - Now

Responsibilities include:

  • Prepare letters.
  • Reviewing the material submittals, sample, catalogue and technical data.,
  • Reviewing method of statement, inspection test plan and monthly progress report.
  • Leading the progress, coordination and workshop meetings moreover prepare the minutes of those meeting.
  • Leading the coordination between the disciplines.
  • develop the performance data ensuring that quality of contractor's products, services and facilities are inspected and monitored.

Projects:

  • New Naval Base Port at Mesaeid Area, Qatar Armed Forces. (Building Package) 3.7 billion QR
  • New Naval Base Port at Mesaeid Area, Qatar Armed Forces. (security Package) 324 Million QR.

ECG Engineering Consultants Group S.A.,

Site Electrical Engineer

June 2012 - August 2017

  • Supervise Inspection of all electromechanical systems including Lighting, Power, Fire Alarm, CCTV, Access Control, MATV, Data/Telephone, Plumbing, HVAC, Water supply, Irrigation and Infrastructure.
  • Supervise coordination between different MEP systems. Supervise material inspection. Supervise the testing and commissioning process.
  • Ensure that all inspection reports are accurate and that all attached documents are the current status. Review shop-drawing documents. Supervise the coordination process between the main contractor and subcontractors to ensure that communications exist and are maintained.
  • Supervise the work procedures and method statements for compliance with good work practices.
  • Review the BMS drawing, installation and testing & commissioning.

Projects:

  • Development of Majlis, Motel and Guest House in Leawaina, Private Engineering Office (PEO). ( Electromechanical Engineer) 484 Million QR
  • Celebration Hall Complex at Rafaa Area, Private Engineering Office (PEO). 232 Million QR
  • Celebration Hall Complex at Al Wakrah Area, Private Engineering Office (PEO). 276 Million QR.
  • New Naval Base Port at Mesaeid Area, Qatar Armed Forces. (Infrastructure Package) 2.3 billion QR.

PEO (Private Engineering Office)

MEP Coordinator

March 2017 - May 2017

To coordinate between the client and all the main &sub-contractors for the authorities’ issues (Kahramaa, Ashghal, and civil defence), Seeking and following up all Electrical permits for the heritage buildings under the PEO, Inspect and monitor the sites before the civil defence inspection and the internal inspection from Kahramaa, Prepare reports of the status of sites permits, handling the problems between the client the contractor to solve and accelerate the work

UEC 2000 (United Engineer Company)

QC Engineer

March 2011 - May 2012

  • Witnessing and sentencing of all site inspections.
  • Coordinate all site inspections with the site main contractors.
  • Ensure that all inspection reports are accurate and that all attached documents are the current status.
  • Ensure all work is correctly prepared prior to any inspection being undertaken.
  • Review all inspection reports for compliance.
  • Assist the site QC manager in the organization, maintenance and control of the quality system.
  • Liaise with the site construction engineers and provide assistance when requested.
  • Prepare non-conformance reports to the QA manager and assist in developing corrective actions.
  • Assist the QC manager and construction manager in resolving any discrepancies and ambiguities.
  • Coordinate with the customers QC inspectors for the resolution of site problems. Coordinate with the site subcontractors to ensure that communications exist and are maintained.
  • Review work procedures and method statements for compliance with good work practices and the customer's contract specializations.
  • The issuance of nonconformance reports in conjunction with the site QC manager.

Project:

  • Burullus Gas Field phase VII site (Egypt), 4 Billion USD.

Sphinx Milling Station

Operation Engineer

January 2009 - September 2011

  • Plan and carry out the maintenance operations necessary for theProduction line.
  • Responsible for planning and achieving the production plan (among the operations team).
  • Responsible for monitoring by SCADA System (BMS) and managing shop-floor operations.
  • Troubleshoot and resolve equipment reliability issues.
  • Plan and carry out the maintenance operations necessary for the production lines and the heavy equipment (leoche mills, extruders, rotor dryer, filters, double shaft mixers, gearboxes, generators, air compressor, wheel louder and fork left).
  • Responsible for spare parts procurement.

Assembly & Construction Engineer

  • Responsible for all equipment installation at the site.
  • Responsible for carrying out all electrical installation at the site including all operating systems after the startup of the factory.
  • Carry-out the assembly and erecting operations of the factory production lines among the assembly team and with the help of assembly experts.
  • Responsible for the cable pulling and termination processes.
  • Manage the hiring or purchasing of the assembly equipment required for the operations (Cranes, Fork-lifts, special gadgets... etc.).
  • Reading mechanical layout.

TOP SERVICE CONSULTANT OFFICE

Electrical Engineer

September 2008 - January 2009

  • Study contract & Reading drawings and identification required by the contract with the client.
  • Issuance of purchase orders.
  • Technical reports for the required materials.
  • Electrical Installation works for Medium Tension Distribution Panel, Transformer, Low Voltage Panels, control panel, cable laying, Fire Alarm System, Lighting System, earthing System, Lightening protection System, Communication System and Control System.
  • The connection for all electromechanical equipment’s at the site.
  • Testing, Commissioning and Startup for all Electrical Systems.
  • Electrical works at the Buildings and Fences. Site electrical services during construction operations. Holding all test for low, medium & high voltage cables.
  • Reading electrical layout and piping& instrumentations drawing.

Languages

Language

English

Intermediate

Language

Arabic

Mother Tongue

References

  • Mohsen El Deeb, MEP Project Manager, +97455160507.
  • Mohamed Azab, Principal Electrical Engineer, +97477223537, +201002772200.
  • Shamel Hosni, Project Manager, +97455559788.
  • Usama Wasfy, Project Manager, +97433181845.
  • Ashraf El Khodary, Lead Resident Engineer, +97466940280.

Education

AIET ( Alexandria Higher Institute for Engineering and Technology)

Mechatronics Engineering - B.Sc.

2003 - 2008

Courses and Certificates

PMP

PLC

Skills

  • Stakeholder relations

    leading Meetings

    Project management

    Customer needs assessment

    Wiring schematics

    Pre-commissioning procedures

    MS Project

    Electrical engineering

    Inspections and reviews