Summary

A team player with excellent communication skills and academic qualifications, who has graduated with a degree **GPA of 3.94 **(BACHELOR OF SCIENCE IN ARCHITECTURAL ENGINEERING) of Atlantic International University

Pioneer Plaza 900 Fort Street Mal 410 Honolulu, HI 96813, USA https://aiu.edu/ https://www.aiu.edu/Accreditation.html

in Architecture Engineering. Possesses a proven ability to ensure projected architectural designs are functional, safe, and economical and meet the needs of the client. Excellent communication skills to keep in touch with clients to ensure that the project designs match their needs. Easy-going by nature and able to get along with both work colleagues and senior managers, currently looking for a suitable architect position.

Please see my previous work and designs through this link >>>>>>>>>>> https://cvrest.com/CV/waelriad

Education

Atlantic International University

ARCHITECTURAL ENGINEERING - BACHELOR OF SCIENCE IN ARCHITECTURAL ENGINEERING

2010 - 2012

Atlantic International University , Bachelor of Engineering (BEng), BACHELOR OF SCIENCE IN ARCHITECTURAL ENGINEERING, 2010 ~ 2012 I a graduate of Atlantic International University.

I graduated in 2012 with a score of GPA 3.94 After doing work equivalent to the materials studied at the Higher Institute of Engineering in Egypt in 1995, and I have a Bachelor of Science in Architectural Engineering from Atlantic International University Pioneer Plaza 900 Fort Street Mal 410 Honolulu, HI 96813, USA

https://aiu.edu/ https://www.aiu.edu/Accreditation.html

https://wnsme.blogspot.com.eg/p/group-thesis.html

Languages

Language

English

Professional

Language

Arabic

Mother Tongue

Achievements

VACSERA PHARMACEUTICAL BUILDING 27

https://wnsarchitect.blogspot.com/2018/05/vacsera-pharmaceutical-building-27.html

I have an honor because Dr.Hassan Dora has chosen my design, which I could have prepared based on scientific theories found in pharmacology and sterilization after big studying it at of references to pharmacology and the Internet and explain to doctors Pharmacy my friends in order to build a hospital (Building 27) , which are now in association of serum and vaccine in Al Agouza and that was in the Safa Farouk for Contracting co. I was then deputy technical director of the office in 2002 and this is the three-dimensional video link building. I have prepared to take it to the Minister of Health (pharmaceutical design) Building 27.wmv pharmaceutical design Building 27.wmv https://www.youtube.com/watch?v=DxE1GqA2nR8

https://wnsarchitect.blogspot.com/2018/05/vacsera-pharmaceutical-building-27.html

https://www.vacsera.com/

Suez Canal Bridge

https://wnsarchitect.blogspot.com/2018/05/suez-canal-bridge.html

I was responsible for working on drawings and architectural and construction, surveying the preparation and the work from an architect's perspective on the three-dimensional Suez Canal bridge, upper QANTARAH, which was a bonus, from Japan, and saw the engineer / Tsu Nachima, chairman of the Japan Kajima Corporation and liked and asked me to travel with him to Japan, but it hit my mother's heart disease was forced to leave the project and sent down to Egypt and this perspective is attached to the files. This is the link to my designs gallery Designs Suez Canal Bridge https://wnsarchitect.blogspot.com/2018/05/suez-canal-bridge.html Egypt Suez Canal Egyptian Japanese Friendship Bridge https://youtu.be/ZoZBU8DdPiI

Urban Planning Director

I was responsible for the redesign of urban planning for Gaza and Jericho, Lebanon and Palestine. I worked for the Lebanese Canadian Company Transcad to solve many problems, including a problem 65000 (Sixty-five thousand maps) by The UNESCO (UNESCO) Agency , which was characterized as deformed and the coordinates are unclear. So I did discover the right solution after subtracting the competition in the company to resolve this problem through Microstation software. I became in charge of training new engineers who came from Egypt and from Canada and Lebanon, where I will travel to Canada and Lebanon to train engineers for My Discoveries my and this was after September atheist famous week then arrived to Employee of the Embassy Fax should not enter any Arabic nationality. Attached is a copy of the letter for travel permission.

I've designed and implemented the building of The Ministry of Manpower & the Ministry of Scientific Research in Tripoli, Libya

https://wnsarchitect.blogspot.com/2021/06/brief-about-me.html

I've designed and implemented the building of The Ministry of Manpower in Tripoli, Libya, and the flat floor of 1200 square meters and consists of the ground floor and four floors and the role of the surface. And that is a model three-dimensional image of the design. After executing it, I designed and implemented the building of the Ministry of Scientific Research in Tripoli, Libya. . It is a model three-dimensional design. The area of each floor is 3313 square meters, so it consists of three buildings next to some of them and there is a Structural spacer (expansion and fall) each 22 meters, so it consists of the building's ground floor and the first floor and the second.

THE LIBYAN MINISTRY OF MANPOWER https://wnsarchitect.blogspot.com/p/the-libyan-ministry-of-manpower.html

THE INCUBATOR OF THE LIBYAN INNOVATORS https://wnsarchitect.blogspot.com/p/the-incubator-of-libyan-innovators.html

Courses and Certificates

IT Essentials I PC Hardware and Software

Cisco System Networking ACADEMY

https://wnsarchitect.blogspot.com/p/experience-certificates.html

Training and experience certificate courses of Cisco System Networking ACADEMY

Cisco System Networking ACADEMY 2007 IT Essentials I PC Hardware and Software (95.6%)

Cisco System Networking ACADEMY, certificate of training and experience , IT Essentials I PC Hardware and Software, I had a certificate of IT Essentials I PC Hardware and Software (95.6%) after** I studied for 3 months from 6/2007 to 9/2007.**

https://wnsarchitect.blogspot.com/p/experience-certificates.html

Certificate of training and experience, surveying course on the Nikon Total Station and GPS devices

Bernasos Surveying Equipment Company

https://wnsarchitect.blogspot.com/p/experience-certificates.html

Bernasos Surveying Equipment Company, Certificate of training and experience, surveying course on the Nikon Total Station and GPS devices. From 4/1996 ~ 7/1996, I took a space course in the Total Station Nikon and GPS devices for 3 months and received a Certificate of training and experience and my score on the test was 94.5%.

https://wnsarchitect.blogspot.com/p/experience-certificates.html

Work Experience

FATTEEN Engineering Consultants Office - The Administrative Capital,Egypt.

Resident Engineer

January 2019 - Now

Project : The project is a hospital of 100 beds capacity in The National Council for the Families of Martyrs and Injured in the Administrative Capital https://www.siac.com.eg/?q=news-events/siac-completed-families-martyrs-and-injureds-medical-recreation-city Responsibilities : Following up the work progress and ensuring the quality of the executed works, the materials supplied to the site and their conformity with specifications and contract Obliging the contractor to execute according to the correct steps for implementation, following up on this and ensuring it, otherwise it is not necessary I represent the owner of the site, and this makes my decisions as if they were issued by the owner. I receive all the ready work before covering it, and I personally make sure it matches the correct plans and implementation steps I am in charge of the site and running the project and the quality of the materials used in the project. I am responsible for the quality of the work performed and managing the contracting time according to the prepared schedule, and I have the right to refuse materials or works that do not conform to the specifications of the contractor and I have the power to direct the contractor according to what the work requires or warns him if he lags at completion and if a deviation occurred in the timetable, or if the contractor did not abide by the specifications and standards of the contracting company, and he receives the daily and monthly reports on the progress of the work.

Al Alameen for trading & General Contracting - North Coast-Egypt

Project Manager

March 2017 - December 2018

Project : 40 Villas + 100 chalets on the Sea (Seashell village ) North Coast http://www.seashellbeats.com/_seashell-north-coast-egypt.html#beats Responsibilities : Coordination with the clients and follow-up progress, Provide Technical Support for the Engineering Dept. Initiated adjustments to existing design in different locations Review of BOQ Monitor day to day execution and assure compliance with drawings. Managed the construction of other administrative & residential buildings. Execution control day by day and to ensure compliance with the drawings. Prepared ahead of time for expected risks and roadblocks, setting up alternative plans to keep projects on-track. Interacted confidently with clients throughout projects, presenting updates, incorporating feedback, and redirecting concerns. Improved future projects based on in-depth reviews of the successes and failures of each completed project.

Wadi Degla Holding - Blumar wadi degla Vilage - North Coast-Egypt.

Executive Director

August 2016 - February 2017

Project : The fourth stage in the village. https://wadidegladevelopments.com/gallery/

Responsibilities :

Receiving all the work of subcontractors and the adoption of the articles and materials needed for the project. Review and adoption of project expenses and inventory quantities and reviewing and approving CAS. Review and select quantities and materials for the project schedule with Technical Office Dates of supplies and materials for the project. Implementation schedule for adoption. Selecting the jurisdiction and responsibility for implementation engineers, Supervisors and all project staff and coordination among them. Providing technical support to the team and following professional Implementation of all project items a day and send daily reports to the project manager and head of sector Monitor day to day implementation and ensure compliance with graphics. Review all designs and Architectural drawings with drawings of adaptation and the fire alarm and telephone and computer networks, such as the Internet, electricity and health.

Al Watanya Enterprise for General Contracting - Fifth Avenue,New Cairo,Egypt.

Projects Manager

August 2015 - July 2016

Project : Villa player Sherif Ekramy & Villa CONSERVE Company. https://www.mountainviewegypt.com/projects/1-mountain-view-i Responsibilities : Review all the designs and drawings, comparison between all the sections of the site and its conformity with paintings, Review the specifications and materials, Site meetings between engineers in all categories and review bids from companies and review the architectural plans for the hotel before delivery, coordination among all the engineers onsite execution control day by day and to ensure compliance with the drawings. Ensure that all tasks are assigned individually and the team is completed collectively as planned on schedule according to the project schedule. Review and matching graphics with the completed structures. Receipt of all acts of subcontractors and the adoption of materials needed for the project and raw.

PSP EL-SEWEDY COMPANY - Fifth Avenue - New Cairo - Egypt

Construction Manager

March 2015 - July 2015

Project : The new office building of the company.

Responsibilities : Review the specifications and materials Active, Meetings between the works of engineers in all sections, Review bids from companies and study, Revising the Architectural drawings of the hotel before handing them over, Coordination between all engineers on site, supervision team, Review of BOQ, Monitor day to day execution and assure compliance with drawings, Ensure that all tasks assigned individually and to the team collectively are completed as planned on schedule.

http://www.elsewedypsp.com/

Al Raki for Contracting in Doha - Qatar

Construction Manager

April 2013 - February 2015

Project : Construction work turnkey to four villas in Doha, Al Mamoura.

Responsibilities : Supply and installation of all the raw materials to build these villas, Ranging from plain and reinforced concrete and ends up finishing turnkey . Responsibilities : Coordination with the Clients and follow-up progress, Provide Technical Support for the Engineering Dept. Initiated adjustments to existing design in different locations, Review of BOQ, Monitor day to day execution and assure compliance with drawings. Managed the construction of other administrative & residential buildings Review Architectural & Surveying drawings and advice corrections. Coordinate between all engineers on site. Making as-built drawings from the site providing technical support to all divisions Performing on Site & monitoring of the Execution of the Architecture & Construction and Supervision of the building and concrete works. Review all the designs and drawings. Comparisons between the works of Active Business. Review the Specifications and materials Active, Meetings between the works of engineers in all sections, Revising Architectural drawings of the Hotel before handing over, Coordination between al Engineers on site Supervise Surveying team. Monitor day to day execution and assure compliance with drawings. Ensure that all tasks assigned individually and to the team collectively are completed as planned on schedule Review conformity of existing As-Built drawings with completed structures.

Study period and certificate equivalency of Atlantic International University

University student

June 2010 - January 2013

Study period and certificate equivalency to get BACHELOR OF SCIENCE IN ARCHITECTURAL ENGINEERING

Description:

I am a graduate of Atlantic International University. I graduated in 2012 with a score of GPA 3.94 after doing work equivalent to the materials studied at the Higher Institute of Engineering and Technology in 1995 , and I have a Bachelor of Science in Architectural Engineering from Atlantic International University, Pioneer Plaza 900 Fort Street Mal 410 Honolulu, HI 96813, USA /

https://aiu.edu/

https://www.aiu.edu/Accreditation.html

https://wnsme.blogspot.com.eg/p/group-thesis.html

https://wnsarchitect.blogspot.com/p/university-graduation-project.html

Yashar Özkan Construction Turkish Company - Benghazi , Libya

Project Manager

January 2008 - May 2010

Project : Electrical Substation in Benghazi City - Ministry of Electricity & Water Responsibilities : Coordination with the clients and follow-up progress, Provide Technical Support for the Engineering Dept. Initiated adjustments to existing design in different locations Review of BOQ Monitor day to day execution and assure compliance with drawings. Managed the construction of other administrative & residential buildings. Review Architectural & Surveying drawings and advice corrections Coordinate between all engineers on site. Making as-built drawings from the site, Providing technical support to all divisions, Performing on Site & monitoring of the Execution of the Architecture & Construction, Supervision of the Building and Concrete works, Review Architectural & Surveying drawings and advise correction.

Green Waves for Construction Company - TRIPOLI,LIBYA

Director of Technical Office

February 2005 - December 2007

Revising the drawings of the department before handing over making as-built drawings from the site Providing Technical Support for the department I made a new design for the Ministry of Manpower for the government. I made a new design for the Ministry of Scientific Research for the government. Make different designs for various places & Performing on Site monitoring of the Execution of the Architecture & Construction and Supervision of Building and Concrete works.

https://wnsarchitect.blogspot.com/p/the-libyan-ministry-of-manpower.html

https://wnsarchitect.blogspot.com/2018/05/the-incubator-of-libyan-innovators.html

El Safa-Farouk Company for Construction - Cairo,Egypt.

Director of Technical Office

December 2002 - June 2005

Project : Redesign for building 27 to manufacture capillary syringe used in serum for diseases such as tetanus Responsibilities : Creation of the architectural designs of new projects, Review architectural designs for other designers. Review for the section responsible for the technical drawings of architectural engineering 2d, 3d Lifting the work that was completed on the sites as built for the work site and that the device Total station and all this by myself. For my innovation design by an advisory adviser, body serum and vaccine, entrusted by the Ministry of Health based on sound scientific theories in Pharmacology and Sterilization to build a factory, building 27, to manufacture capillary syringes, Used serum for diseases such as tetanus

TransCad for Mapping - Cairo,Egypt.

Urban Planning Director

March 2000 - November 2002

Project : Urban planning for Gaza, Jericho, Palestine and Lebanon, with a volume of 65, 000 maps Responsibilities :

Performing the Surveying Drawings including the Longitudinal Sections, Cross Sections, Profile in Natural, Ground & Stakeout point and Correction Point on Site & Revising the Maps before final submission.

Providing Technical Support for the department & Technical Training for new employees at Microstation Program.

Responsible for modification of the architectural parts of the map. I HAVE MADE THE FOLLOWING ACHIEVEMENTS AT TRANSCAD CO.

I discovered a big problem regarding the map's such, which avoided the company being put in a critical situation. The solution was reformation of the map, which has been,. Unfolded i.e. wrinkled.

I have done the re-drawing of it. once more. The numbers of maps reformed were 65000. Converting the files from micro station program to AutoCAD Program, and Maintaining the entire map's Specifications N.B I wish to mention that I have been nominated to travel to the company's Head Office in Lebanon for making some amendments concerning the problem of the map and applying the solution stated above.

Zone Company for Engineering - Cairo,Egypt.

Senior Architectural

December 1998 - February 2000

Responsibilities :

Create all architectural shop drawings for the projects.

Review for the section responsible for the technical drawings of architectural engineering 2d, 3d, were measurement and lifting execution works that were completed on the site built for the work, Drawings by Total station.

Performing the Surveying Drawings including the Longitudinal Sections, Cross Sections, Profile in Natural, Ground & Stakeout point and Collection Point on Site.

Converting all total station data to drawings.

Nile Engineering & Consulting Office - Cairo,Egypt.

Deputy Director of the Technical Office

January 1996 - November 1998

Responsibilities:

Created 3D Architectural perspective of the Upper Suez Canal Bridge,

Created all architectural shop drawings for the project,

Review for the section responsible for the technical drawings of architectural engineering 2d, 3d,

Lifting the work that was completed on site ( as built) for the work on the paintings and the device, Total station, and all this by myself

Skills

  • Computer Skills

    Photoshop,Time Management,Presentation,Microsoft Office,Illustrator, Google Drive,MicroStation,Primavera P6,AutoCAD 2D/ 3D Modeling,3D Studio max, V-ray,(Rendering Material and Architectural,

    Archicad,Animation 3D

  • Engineering Skills

    Design development,integrated design Time management Organized,Strong verbal and written communicator,Site investigation,reports retail and commercial architecture, Motivated self-starter

    Total Station (Nikon,Trimble,Sokkia,leica) and GPS devices & GIS digitizing,Time Management,Presentation,Coordination,Supervision,Reviewing,Organized

  • Personal Skills

    The Mission Impossible Person, Trustworthy, Ambitious, Persevering, Friendly, Teamwork Person with a Spirit of Love,Dedicated Verbal and Written Communicator

Projects

WORKING DRAWINGS FOR THE INCUBATOR OF THE LIBYAN INNOVATORS

Building designer and executor

April 2006 - May 2007

I am the one who designed the building completely architecturally (interior and exterior, furniture, decor, and a three-dimensional perspective) and I also implemented the building at the request of the Libyan Minister of Scientific Research, Dr. Engineer / Mohamed Al-Aswad

WORKING DRAWINGS FOR THE LIBYAN MINISTRY OF MANPOWER

Building designer and executor

March 2005 - March 2006

I designed the building completely architecturally (interior and exterior, furniture, decor, and 3D perspective) and I also implemented the building at the request of the Libyan Minister of Manpower Dr. Engineer / Matouk Mohamed Matouk